Home / All / Belt conveyor safety operation regulations /

What should be paid attention to for conveyor installation and commissioning

What should be paid attention to for conveyor installation and commissioning

Update Time:2019/12/20
Precautions for installation and commissioning

1, Precautions during belt conveyor installation

1). All rollers, idlers and driving devices shall rotate evenly and flexibly after installation;
). During the test operation, if the belt deviates, adjust the mounting point or frame of E-pin to adjust the deviation;

2, Test operation shall be carried out after installation

1). Two hours of no-load and eight hours of load operation shall be carried out before putting into use.
2).Check whether the arrangement of electrical signal and control device is correct;
3). Start the motor to see whether the roller direction is correct, pay attention to the wiring of the control switch, and ensure that the belt conveyor is rotating forward;

3,  Precautions during commissioning

1). Check whether there is obvious noise in the operation of each fastener. 
2). Check whether there is abnormal temperature rise of each bearing; 
3). The rotation and fastening of the roller carrier;
4). The control buttons of each electrical equipment shall be sensitive and reliable;

conveyor installation